Bottom line:
- When the mail says BSMI, do three things this week: confirm the unit is an in-scope commodity, get papers that log on the commodity-inspection portal, and name the certificate holder and the party who files this shipment.
- BSMI writes registration of product certification, batch inspection or a declaration of conformity, then the inspection mark as the regulation requires.
- Retitle a CE file or an FCC ID and the next email will ask for a registration number. Labs quote by project. There is no site-wide official price. Store membership is wired to ALIBABA.COM HONG KONG LIMITED and does not register the unit with BSMI.
Tuesday afternoon’s RFQ is one line: “Need BSMI certificate, PI by Friday.” The unit is a desk lamp with a USB charging port, and the attachment also lists a loose charger. Sales staples the luminaire CE declaration and the charger FCC grant into one PDF, renames the file BSMI, and replies that the certificate is attached and the PI will follow on Friday.
Wednesday the supplier sends last year’s luminaire registration scan. Docs have not opened the portal. Sales has already copied the number into the quote draft. Finance asks how much “official BSMI fee” to lock into the unit price. The shop floor asks whether the carton can print the inspection mark first.
Thursday the buyer writes back: the registration number does not appear on the BSMI query. Docs finally open civil.bsmi.gov.tw. The commodity name on the portal is a luminaire; the RFQ wants a charger and a lamp on two lines. The certificate holder is another trading company, not the seller on the contract. The factory is last year’s plant. The number is not “missing.” It does not cover this unit.
Friday’s PI cannot still say “BSMI certified.” Send a correction the same day: the attachments are European or United States path technical files; the commodity-inspection number is being rematched; the old page is withdrawn. Japan’s path sits on PSE. Korea sits on KC. Do not put those files in the same weekly attachment as Taiwan commodity inspection. The order below is the one a sales desk, a docs clerk and a workshop can use this week: scope first, then people, then the portal, then the reply and the mark.
Confirm the unit is an in-scope commodity this week
BSMI lists commodity inspection as its own line of work and keeps publishing the commodities subject to inspection and the related inspection regulations. Before sales answers the first mail, do not talk about “how many weeks for Taiwan certification.” Open www.bsmi.gov.tw, go to commodity inspection, and find the current in-scope list and the matching regulation. Take three things to that list: the commodity name on the invoice or the RFQ, the rated voltage, and whether the unit is electrified.
Do not use the showcase marketing name. Use the generic name on the spec sheet: desk lamp, power supply, extension cord, electric fan — not “Nordic desk-lamp set.” Write the rated voltage, for example 110 V or 220 V AC, or the DC output, not “global voltage.” Electrified means a mains cord, an adaptor, a battery bay or a USB power port. Plain mechanical goods with no electrical circuit and a live lamp or charger are often not the same row on the list.
A workable pass through the list looks like this. Search the commodity-inspection pages with the product-name keywords. When a nearby class appears, read whether the regulation also cares about voltage, the kind of supply, or whether the article is electrified. Then check whether the unit has a radio function. Being electrified and having a radio are two facts. The second one opens a telecom file of its own. The list and the regulations are published for the current period. Do not treat a screenshot from last year’s folder as this week’s rule. Before you open the site, write the commodity name, the rated voltage and whether the unit is electrified on a scrap note, and search with the generic name from the spec sheet, not the showcase line. If a nearby class still fails on voltage or on whether the article is live, treat the unit as not listed. Do not slide it into the neighbour class yourself. After the list matches, put that class name into the laboratory inquiry. Do not write “full Taiwan pack.”
On plain mechanical hardware, furniture with no electrical parts, or ordinary textiles, a spoken “need BSMI” is often a chain’s own gate policy, not an in-scope commodity under the Commodity Inspection Act. Ask the buyer to name the commodity class or the inspection regulation. If they cannot, treat it as a purchasing document. Do not start a lab, and do not write “BSMI passed” on the PI.
Only after the unit sits inside the in-scope list do you enter the three routes. The current regulation names the route. An intermediary does not pick “whichever is faster.” Sales should not promise “we will take registration” or “we will take batch inspection” in the first reply unless the regulation is matched and you already know who the certificate holder is and who files this shipment.
Live lamps, power supplies and household electrical goods are the RFQs where a BSMI line most often means you really must open the current list. Even then, match the list before you talk to a laboratory. If the list does not take the unit, do not quote a “Taiwan certification” lead time. If the list takes it, move to who applies, who files the batch, and who keeps the declaration.
Three routes: who applies, who files the batch, who keeps the declaration
Under the Commodity Inspection Act, in-scope commodities usually take registration of product certification (RPC), batch inspection, or a declaration of conformity, and then use the inspection mark as the regulation requires. The three routes are not three nicknames for one “Taiwan certificate,” and they do not stand in for each other by a renamed file.
RPC sits on the type and the certificate holder. What the portal can verify is this type, this holder, and the factory written on the registration. A new model, a new power spec or a new contract manufacturer often kills an old registration. The usual place for a Hong Kong seller is to ask the supplier for the number and the holder and to check the portal themselves — not to become the holder on Tuesday afternoon.
Batch inspection sits on this import or this factory lot. The party who files at the port is often the Taiwan importer. A Hong Kong company on the PI and a mainland shop floor making the goods do not automatically become the obligated party for the batch. You still owe a specification and a lot identity that match the invoice and the packing list. Who files the batch belongs in the contract. Do not assume the seller has already filed it.
A declaration of conformity is made and kept by the obligated party, with the technical file. Market surveillance will ask to see what was kept. A declaration does not give you a registration number you can treat as RPC on the portal. Do not rename the first page of a declaration and send it as a registration.
| Route | What it sits on | Usual Hong Kong seller job | Usual Taiwan importer job |
|---|---|---|---|
| Registration (RPC) | Type, certificate holder, factory | Collect the number and the holder; match them on the portal | Check that the registration covers this invoice model |
| Batch inspection | This import or factory lot | Hand over specs and lot data that match the invoice and packing list | Often files the batch on the port side |
| Declaration of conformity | The obligated party’s declaration and kept file | Confirm who the obligated party is and whether the declaration covers this unit | Must be able to produce the kept file if asked |
The break that shows up most often is this: sales hears “our factory has BSMI” and writes the shipment as already inspected. Registration sits on the holder and the type. Batch inspection sits on this lot. The declaration sits in the obligated party’s file. Split those lines in the contract. Do not write “seller is responsible for all Taiwan certification.” Store membership buys a showcase. Wire it to ALIBABA.COM HONG KONG LIMITED. It does not register the model with BSMI and it does not make you the party who files the batch.
If an intermediary says “issue a general certificate first, file the batch later,” do not put that sentence into the unit price this week. Labs and bodies quote by institution and model. There is no site-wide official price. The cost of picking the wrong route is not a new filename. It is a portal miss, and a contract seller who cannot produce batch papers when the port asks.
What you collect from the supplier, what you ask the Taiwan buyer
Sales often turns “need BSMI” into one empty mail to the supplier: please send the certificate. The supplier returns a scan, and the chain dies on Thursday at the portal. Split the collection list this week. One half goes to the supplier. The other half goes to the Taiwan buyer.
From the supplier you want papers that can survive the portal, not a handsome first page. At minimum: the commodity name and model on the spec sheet, the rated voltage, whether the unit is electrified, whether it has a radio, the registration number they claim, the legal name of the certificate holder, the factory as written on the registration, a spec sheet that matches the invoice name, and any written instruction on how the inspection mark is to be used. If the factory or the holder is missing, do not forward the scan.
From the Taiwan buyer you want to know which route the RFQ actually means. Ask whether their BSMI line is an in-scope commodity or a chain gate policy; whether they want a registration number they can query, or whether their Taiwan importer will file batch inspection on this shipment; who the Taiwan importer is; which commodity class or inspection regulation they have in mind; and, if the unit has a radio, whether NCC is also due. If they cannot name a class, treat the request as purchasing policy. Do not start a lab on their behalf.
| Ask whom | Fields due this week | If the field is missing |
|---|---|---|
| Supplier | Name, model, voltage, number, holder, factory, spec sheet | The portal will miss; the scan stays inside |
| Taiwan buyer | In-scope or policy; registration or import batch; who the importer is | The contract will say the seller handles every Taiwan mark |
| Docs, internally | A match record on civil.bsmi.gov.tw | Sales will put a failed number on the PI |
A number that arrives from the supplier goes to docs first, not to the buyer. The importer name that arrives from the buyer goes into the batch line of the contract draft, not onto the showcase as “saleable in Taiwan.” Until both sides of the list are in, the quote pack says the path is still being checked.
Match the registration on the portal: fields to tick
When the supplier scan lands, open the commodity-inspection portal before the buyer sees the file. The window is not there to confirm that a string of digits exists. It is there to confirm this unit. Type only the number and skip the commodity name and the factory, and Thursday’s miss comes back. Sales and the clerk who matches documents tick the fields below. Stop if any one fails.
- Commodity name. Does it match the invoice, the RFQ and the spec sheet? Has a luminaire registration been placed on a charger, or has one accessory in a set borrowed the login of the whole lamp?
- Model. An extra letter, a power spec that moved from 12 V to 24 V, or a set that is now sold as a single SKU is a new type. Do not talk past it as “series certification.”
- Certificate holder. Is it the supplier, the contract manufacturer, or another trading company? Is it the same legal person as the seller on the contract? If it is not, the PI must not say the seller holds that registration.
- Factory. A new contract manufacturer or a new power spec often kills an old registration. If the factory on the packing list is not the factory on the portal, treat the unit as not covered.
- Registration status. Is it still valid? Has it been cancelled, or does it no longer match the current inspection regulation? An expired screenshot or last year’s PDF is not this period’s evidence.
- Inspection-mark usage. Is the way the mark must be used written in a packing instruction you can actually run, or do you only have the first page of a certificate? If there is no instruction, the shop floor does not invent a “BSMI mark.”
If any of the six fields fails, tell sales the same day: do not send a price that says “certified” or “saleable in Taiwan.” Only when the fields match do you put the number into the commodity-inspection line of the quote pack, and you note that the portal record controls. Keep the screenshot in an internal folder. Do not send a failed result to the buyer as an explanation.
When the path is a declaration of conformity and there is no registration number to query, do not let the declaration’s first page stand in for RPC. When the path is batch inspection and there is no registration number to copy, do not change the date on the last shipment’s batch paper. A number that does not log is deleted. Do not change one digit and try again.
Thursday’s lamp RFQ broke on the fields: the name was a lamp, the RFQ had a charger; the holder was not the contract seller; the factory was the previous generation. If sales wrote the number into the draft on Wednesday, Friday is a correction letter. The person on the portal is not “proving we have a certificate.” They are deciding whether Friday’s PI may show a commodity-inspection number at all.
After you send CE or FCC, what the next email will ask
CE answers conformity under European Union directives. FCC answers United States radio-equipment authorisation. Both can sit in a laboratory homework folder. The portal wants a registration, a batch filing or a declaration on the commodity-inspection path. Retitle those files and send them, and the buyer or the broker’s next mail almost always asks for a registration number or a batch number, and for a commodity name, a holder and a factory that match.
The next email usually contains one of four sentences: the registration number does not appear on the portal; the commodity name does not match the invoice; the certificate holder is not the seller on the contract; the radio unit has only an FCC ID. Do not write “CE + FCC = saleable in Taiwan” in one sentence. Japan’s PSE and Korea’s KC do not fill this column either. Each mark keeps its own page.
If a CE pack has already gone out, send a correction the same day. Say the attachments are European or United States path technical files, and that the commodity-inspection number is being rematched this week. Do not leave the old mail to an oral explanation. Use full sentences, for example: “The files attached on Tuesday are an EU declaration of conformity and a United States radio authorisation. They are for laboratory preparation only. They are not registration of product certification or batch-inspection papers under BSMI commodity inspection. The inspection path and any number that can be verified on the portal for this unit will follow in a separate mail. Please treat this letter as controlling. Any earlier wording that the goods are BSMI certified is withdrawn.”
If a PI must still go out on Friday, write the commodity-inspection line as “path being confirmed; any number will be the one the portal can verify.” Do not leave a blank for the buyer to fill with “BSMI included.” Delete finance’s cell for an “official BSMI fee.” Labs quote by institution. There is no site-wide official price. Lock a made-up official fee into the unit price and the next email will ask for an invoice and a certificate.
Radio gear: split NCC from commodity inspection
Passing commodity inspection does not empty telecom approval. BSMI handles registration, batch inspection, declarations and the inspection mark for in-scope commodities. The National Communications Commission handles telecom-terminal and radio approval. Two windows, two numbers. They are not one “Taiwan certification.”
Give docs two folders this week. One holds only BSMI-path registration or batch papers. The other holds only telecom approval. The reply uses two lines. Do not merge them into “Taiwan certification complete.” If the buyer wrote only BSMI, sales still asks whether the model has Wi-Fi, Bluetooth or another radio. If it does, put NCC on its own line in the reply so Friday’s PI does not show commodity inspection alone and Monday’s mail ask for telecom papers.
A model that already has an FCC ID can send the test report to a laboratory as preparation. The ID does not fill a registration number and it does not fill NCC. The shop floor does not print an FCC ID as the inspection mark. The showcase does not write an FCC ID as “Taiwan certified.” When radio homework and a commodity-inspection number appear in the same mail, label each path.
The practical split is in the filenames and the paragraphs. Do not name an attachment “Taiwan-all-certs.” The commodity-inspection pack holds only a registration summary that logs on civil.bsmi.gov.tw, or the agreed batch arrangement. The telecom pack holds only NCC papers. If the buyer glues the two packs into one sentence, “BSMI/NCC ready,” split the sentence in the reply. Do not follow the glue.
Luminaire login on a charger, Wi-Fi lamp with an FCC ID only
First unit: the supplier renames a luminaire registration PDF and sends it as the charger’s BSMI. The portal commodity name is a lamp. The model is the lamp. Voltage and supply are written for the lamp. The charger is another type. Registration sits on the type. Sharing a carton does not merge two types into one login. This week you match the charger on its own name, voltage and whether it is electrified against the in-scope list. If the charger is in scope, match its own registration or batch path. Do not borrow the lamp’s number.
The buyer’s next email will ask why the names do not match. Do not explain that “the set passed together.” The portal does not merge types because they ship as a set. A set can share one invoice. It cannot share a registration that does not cover the line. On the PI, give the lamp and the charger their own path lines. The line that has not matched yet says the path is still being checked.
Second unit: a Wi-Fi desk lamp. The supplier sends only an FCC ID and a radio report. Sales treats a United States radio authorisation as a Taiwan fill-in. If the lamp is an in-scope commodity, it still takes registration, batch inspection or a declaration. A telecom terminal still takes NCC on a separate line. The FCC ID fills neither. If the shop floor has already queued cartons around the FCC ID, stop the job. Do not draw the FCC mark as the inspection mark, and do not print “BSMI: to follow” on the pack.
Both units take the same actions this week: match the list, match the portal fields, then decide whether the PI may show a number. The break is different. The first unit borrowed a name and a type. The second unit used a United States radio number to stand in for two Taiwan paths. Write the break in the reply. That is more useful than another retitled PDF.
Lines to delete from the PI and the contract
Before Friday’s PI leaves the desk, delete these lines from the draft. They are delivery promises, not courtesy phrases.
| Line in the draft | Replace with | If you leave it |
|---|---|---|
| BSMI certified / already passed BSMI / saleable in Taiwan | In-scope goods follow the BSMI path; any number is the one the portal can verify | The buyer screenshots the line and asks for a number that will not log |
| Official BSMI fee included in the unit price | Testing and certification are quoted by the body for this model and stay off the goods price | The next mail asks for an official invoice; BSMI publishes no site-wide official price |
| CE / FCC accepted as BSMI | Delete. CE and FCC stay in their own technical annexes | The portal wants a commodity-inspection number, not a European or United States path |
| Seller handles all Taiwan certification / seller is the inspection obligor | Name the certificate holder; name the party who files this batch, often the Taiwan importer | The port asks for batch papers and the contract seller cannot produce them |
| Print the inspection mark first; certificate to follow | Do not print the inspection mark until the number logs | The shop floor prints the wrong mark; recalling cartons costs more than a PI revision |
| Luminaire registration covers the charger in the set | Give each type its own line; the unmatched line stays “path being checked” | The portal names do not match and the whole lot is treated as unregistered |
If the contract already says “Seller shall provide BSMI certificate before shipment,” issue a one-page revision this week. Replace “certificate” with a sentence that the seller will, for any in-scope commodity, follow registration, batch inspection or a declaration of conformity under the Commodity Inspection Act, and will provide a number or a batch arrangement that can be verified on the portal. Do not leave the shorter “provide BSMI” in the main text.
Store membership, Trade Assurance screenshots and a factory-audit PDF are not commodity-inspection annexes. Membership is wired to ALIBABA.COM HONG KONG LIMITED. It buys a showcase. It is not a registration.
Sales reply this week, and the shop-floor marking order
Answer a Taiwan RFQ in full sentences. Do not brush it off with “we have the cert” or “certification in process.” Sales can copy this block:
“Thank you for the inquiry. For commodities subject to inspection, the Bureau of Standards, Metrology and Inspection provides three paths: registration of product certification, batch inspection, or a declaration of conformity, and then the inspection mark as the regulation requires. We will first match this unit’s commodity name, rated voltage and whether it is electrified against the current in-scope list, and then verify any registration on the commodity-inspection portal or confirm who files this shipment. The CE conformity file and the FCC authorisation are attached only as laboratory preparation. They do not replace a registration number or batch papers. If the model has a radio function, any NCC telecom approval will be listed on its own line and will not be written into one sentence that the goods are ‘Taiwan certified.’ Testing and certification are quoted by the institution for this model. The unit price does not include an official BSMI fee. Opening the store does not register the model with BSMI. After the portal match, any number or batch arrangement will appear in the commodity-inspection line of the quote pack and will follow the record the portal can verify.”
Do not send: “we have BSMI,” “the official certification fee is in the unit price,” “print the mark first, certificate later,” “CE plus FCC means saleable in Taiwan,” or “the lamp certificate covers the charger.”
After Thursday’s portal miss, Friday’s correction to the buyer can follow that block: “The scan and the BSMI-certified wording in the earlier mail are withdrawn. The commodity name, the certificate holder and the factory do not match the portal for this unit. We will rematch this unit. We will not send a number that cannot be verified.”
The shop floor this week only runs the marking order. It does not decide what a “Taiwan mark” should look like. The order is: if the registration has not logged on the portal, do not print the inspection mark; do not use a CE mark or an FCC mark in place of the inspection mark; do not print an FCC ID in the place reserved for the inspection mark; do not print “BSMI to follow” on the carton or the leaflet; do not write “BSMI passed / saleable in Taiwan” on the showcase. You may say the seller is a Hong Kong company, that in-scope commodities take the BSMI mark as the path requires, and that any number follows the record that can be verified.
If the shop floor has already opened print files around a wrong registration number, stop the press. Hand the commodity name, the model and the proposed print to docs, and wait for a portal match. Do not ship cartons that already carry the wrong mark. Mark usage follows the instruction that comes with the registration or the regulation. The shop floor does not design a new mark.
- Same day, sales and docs hand over the model, voltage, whether it is electrified, whether it has radio, and whether the buyer asked for a registration or import batch inspection.
- Next morning, the shop floor or the supplier hands over the holder, registration or batch papers, a spec sheet that matches the invoice name, and the factory name.
- On match day, docs tick name, model, holder, factory, status and mark usage on the portal; failed results stay inside.
- On quote day, sales sends a verifiable number summary — or “path still being checked” — and withdraws any earlier certified wording.
- Before print, the shop floor only uses the inspection-mark instruction that already logged. No number, no mark.
Holder changed, factory changed, or the cargo is already moving
If the certificate holder moves from the factory to a trading company, or the factory on the registration changes, do not copy the old login into the new contract. Rematch the new type this week. If a new registration is due, start that work. Do not let an intermediary “issue one general certificate.” Labs and bodies quote by project. There is no site-wide official price. Do not invent a registration number.
When the holder changes, the person on the portal and the seller on the contract diverge. If the buyer insists on a registration in the seller’s name, sending the old number only recreates Thursday’s miss. When the contract manufacturer changes, the type may still exist and the factory may already be off the registration. A packing list that names the new plant and a PI that copies the old number will be treated as not covered.
If the cargo is already on the water, send only papers that actually match. Do not hand the master account to an intermediary to “fix the certificate.” Do not print a late sheet of inspection marks and ask the forwarder to stick them on at a transhipment port. What market surveillance asks for follows BSMI’s current handling. Do not write a specific penalty into the contract as a quoted price, and do not invent a processing time in the mail to the buyer.
When the cargo is moving and the portal still misses, sales can send a written note that lists the commodity name, model, holder and factory already checked, and which field failed; mark CE and FCC as homework; and ask whether the Taiwan importer will file this batch. Sales cannot invent a registration number, back-date the last lot’s batch paper, or promise that a certificate will exist before arrival.
Corpable can sit with the team on which route this unit takes and which field is missing when the portal does not log. We do not stand in as the certificate holder, we do not apply to BSMI on your behalf, and we do not guarantee clearance at the port. Membership fees still go to ALIBABA.COM HONG KONG LIMITED.
Questions teams actually ask
Where do we check a registration number this week?
Use BSMI’s commodity-inspection portal at civil.bsmi.gov.tw. Do not forward a scan until the commodity name, model, certificate holder, factory and number match. If they do not match, write “path still being checked” — do not send a retitled CE, and do not paste a luminaire login onto a charger.
Is the Hong Kong company the obligated party under commodity inspection?
Not automatically. Registration of product certification sits on the type and the certificate holder. Batch inspection of an import lot often sits with the Taiwan importer. A declaration of conformity is kept by the obligated party. A Hong Kong PI and a mainland shop floor do not by themselves make you the party who files the batch.
Where do we see whether the unit is an in-scope commodity?
On the BSMI site (bsmi.gov.tw), under commodity inspection, match the current list of commodities subject to inspection and the related inspection regulations. Use the product name, the rated voltage and whether the unit is electrified. On plain hardware or furniture with no electrical parts, a spoken “need BSMI” is often a purchasing policy, not an in-scope commodity.
Can a luminaire registration be retitled for a charger?
No. Registration sits on the type and the certificate holder. A new commodity name, model, power spec or factory will not stand in. The next email will ask for a name mismatch. Rematch this unit. Do not rename the neighbour SKU’s PDF.
The unit has Wi-Fi. What else is due besides commodity inspection?
Keep NCC on its own line. Commodity inspection and telecom approval are separate files. Do not write them into one “Taiwan certified” sentence. An FCC ID can be radio homework. It does not fill a registration number or an NCC line, and it must not be printed as the inspection mark.
Can we lock an official BSMI fee into the unit price?
No. Labs and certification bodies quote by institution and model. There is no site-wide official price. Store membership is wired to ALIBABA.COM HONG KONG LIMITED and buys a showcase. It does not register the model with BSMI.
Related reading
- CE: how the file is built
- FCC: how to use a radio ID
- PSE: who notifies in Japan
- KC: the Korean safety routes
- Contact Corpable · info@aliad.hk
Written by Corpable Marketing Limited for Alibaba.com Hong Kong-channel sellers. Not legal, tax, or audit advice. Platform, customs, bank, and auditor outcomes follow the latest official notices. Membership fees go to ALIBABA.COM HONG KONG LIMITED. Corpable does not collect them.